Saturday, 27 February 2016

Exam 220-901 CompTIA A+ Certification Exam

Today’s IT professionals face an ever expanding variety of technical issues. CompTIA A+ 220-901 & 902 has been updated to address the
increased diversity of knowledge required of today’s technicians and validates what is currently necessary to perform effectively on the job.

“A+ opens the door to understanding mobile device sensors, small and large storage, as well as wired and wireless transmission standards.
These three things are, in many ways, three pillars for the Internet of Things

The New A+ Preparing today’s IT pros for tomorrow’s technology

A+ 900 SERIES DOMAINS
Hardware - 34%
Networking - 21%
Mobile Devices - 17%
Hardware & Network Troubleshooting - 28%

Candidates still earn the CompTIA A+ certification by passing two CompTIA A+ exams: 220-901 & 220-902.
Both exams include multiple-choice and performance-based questions that require candidates to solve real-world problems.

What’s Changed and Why

SECURITY
Security is not just for the Security Administrator. Help desk and technical support professionals form one of the first lines of defense for any organization.

• While the Security domain weighting remains the same at 22%, there is an increased emphasis on the ability to apply security-related knowledge. For example, candidates are asked more frequently to “deploy” and “use” security best practices, rather than simply “describe.”

• The sub-objectives for the Security domain have also been expanded to reflect the increased attack surface of a typical organization along with the resources and tools that have arisen to protect it. For example, compare sub-objective 3.4 in A+ 902 with sub-objective 2.3 in A+ 802.

• Security concerns permeate both the 901 and the 902 exams. In fact, 8 of the 9 total certification domains have an objective or sub-objective containing a security consideration.

HARDWARE
Broad adoption of a variety of computing devices demands more of today’s IT technicians.

• Mobile devices earn their own hardware-focused domain on the 901 exam.

• The new exams are weighted less heavily toward PC-focused hardware, decreasing from 51% spread across two domains on the 801 exam to 34% on the 901 exam.

• While the weighting changes (meaning the total number of items presented), the range of knowledge specific to hardware remains intact – familiar printer and PC hardware objectives remain on the exams.

NETWORKING
The increasingly network-aware help desk/tech support environment requires command of networking principles to perform the IT support role.

• Enterprises increasingly rely on a combination of cloud and on-premises IT systems. For those supporting those systems and their users, cloud concepts must be well-understood.
The A+ 900 series starts an IT pro on that journey with an introduction to cloud and virtualization, the cloud’s core underlying technology.

• Like the 800 series exams, the 900 series continues the emphasis on a tech’s ability to apply core concepts and protocols such as IPv4, IPv6, DHCP, and subnet mask to set up and support wired and wireless networks

MOBILE DEVICES
Mobile continues to dominate personal and business technology with multiple types of systems tied to one user.

• 5 of the 8 new objectives found in the 900 series belong to mobile devices.

• Mobile devices break out of their single-domain treatment. Previously they were covered only in 802, now 220-901 covers mobile device hardware and 220-902 covers mobile device applications, operating systems and security.

• Also added are items specifically related to troubleshooting mobile device issues.


SOFTWARE, HARDWARE & NETWORK TROUBLESHOOTING
Customers increasingly demand instant, accurate diagnosis and resolution.

• The IT role has expanded from supporting desktops and laptops to include myriad types of other devices, from laptops and mobile phones to industrial sensors and wearables.

• The demand is high for quick accurate problem solving.

• Technicians must consider many different scenarios when solving a problem including:
- Wireless
- Mobile
- Cloud Technologies

• Troubleshooting is represented on both A+220-901 and A+ 220-902. Previously, it was only represented on A+ 802.


OPERATING SYSTEMS
Technicians need to increase their knowledge of operating systems across a wide variety of devices to effectively support the end user.

• The 900 series features a Windows OS domain along with a second OS-focused domain - The second OS domain includes objectives requiring a working knowledge of Mac OS X and Linux.

• Operating systems serving as the platforms for mobile device applications – including iOS, Android and Windows – are covered within the 220-902 exam.

QUESTION 1
A technician replaces a failed hard drive with a brand new one. The technician boots from a PE CD and attempts to install a custom OS build deployed from the network. The hard drive is visible in the system’s BIOS. However, once in the preinstallation environment, the drive is not recognized in the imaging process and the process fails. Which of the following is MOST likely the cause of failure?

A. The boot CD has failed and needs to be replaced.
B. The hard drive needs to have its configuration manually defined in the BIOS.
C. The PC’s power supply is not providing enough power to the new hard drive.
D. The hard drive has not been partitioned correctly.

Answer: D


QUESTION 2
Which of the following wireless technologies is LEAST likely to be intercepted by a third party?

A. NFC
B. Bluetooth
C. WiFi
D. Cellular

Answer: A


QUESTION 3
Joe, a user, receives a wireless router from his ISP with a pre-set password and configuration. He can connect to the router fine via Ethernet but cannot see the wireless signal on any of his devices. The LEDs on the router indicate that a wireless signal is broadcasting. Which of the following settings on the router does Joe need to adjust to enable the devices to see the wireless signal?

A. DHCP
B. IPv6
C. DMZ
D. SSID

Answer: D


QUESTION 4
Which of the following protocols would be used for file sharing between MAC OS and Windows OS workstations on a LAN?

A. IMAP
B. SMB
C. SSH
D. RDP

Answer: B


QUESTION 5
Which of the following is used to facilitate communications with a user’s smartphone in order to make purchases and payments by proximity?

A. Bluetooth
B. IR
C. NFC
D. WPS

Answer: C


Saturday, 20 February 2016

650-155 ISIWS Cisco IronPort Security Instructor - Web Security

Exam Number 650-155
Duration 60 minutes (50-60 questions)
Available Languages English

This exam tests your knowledge of Cisco IronPort web security appliances. To receive this certification, you should be able to train students on how to install, configure, administer, and troubleshoot Cisco IronPort web security appliances.

Exam Topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

There is no specific recommended training course associated with this exam, however knowledge of the exam topics and the product(s) associated with this exam are recommended to pass this exam. Cisco Partners can access the Partner Education Connection (PEC) for access to a variety of training content to help them prepare for this exam.


QUESTION 1
Which of the following commands is used to view the cache hit rate?
Select exactly 1 answer(s) from the following:

A. proxystat
B. proxyconfig
C. advancedproxyconfig
D. webcache

Answer: A

Explanation:


QUESTION 2
Match the HTTP response code with the meaning or use.



Answer:



Explanation:
401-3
403-1
404-4
407-2


QUESTION 3
Which of the following S-Series CLI commands car help troubleshoot WCCP?
Select exactly 1 answer(s) from the following:

A. weep debug enable
B. tail proxylogs
C. tail accesslogs
D. show weep

Answer: B

Explanation:


QUESTION 4
Match the port number to the use on the S-Series.



Answer:



Explanation:
80-2
443-3
8080-1
8443-4


QUESTION 5
Which of the following is a draw-back in using McAfee heuristic scanning?
Select exactly 1 answer(s) from the following:

A. Heuristic scanning increases the probability of false positives.
B. Heuristic scanning increases the probability of false negatives.
C. Heuristic scanning cannot detect new malware with unknown signature.
D. Heuristic scanning requires a separate license key.

Answer: A

Explanation:

Wednesday, 10 February 2016

650-128 CGAM Authorized Connected Grid Account Manager Knowledge Verification

650-128 CGAM Authorized Connected Grid Account Manager Knowledge Verification

Exam Number 650-128
Duration 30 minutes (20-25 questions)
Available Languages English

This exam will test the knowledge of account managers regarding the features, functions, and design of the Cisco Connected Grid technology solution. There will be a focus on the features and benefits of the Cisco 2010 Connected Grid Router (CGR 2010) and the Cisco 2500 Series Connected Grid Switch (CGS 2500). How these products are positioned within energy and utility companies and how to identify new opportunities and set customer expectations will also be covered on this exam.

Exam Topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Introduction to Cisco Connected Grid Go-to-Market and Product Positioning
How to Sell
Cisco Connected Grid Ordering and Support
Cisco Connected Grid Solutions

QUESTION 1
Which of these trends is the main driver toward smart grid technology?

A. increased supply, which requires the integration of distributed generation sources
B. reduced demand, which causes an increase in demand and peak load
C. compliance with regulations involving government funding and rules
D. increased carbon footprint

Answer: C

Explanation:


QUESTION 2
How many levels or types of priority can be assigned on a Cisco TAC case?

A. 1
B. 2
C. 4
D. 3

Answer: C

Explanation:


QUESTION 3
Which statement reflects the overall Cisco Smart Grid vision?

A. Sell the existing Cisco IP-based products from end-to-end of our utility customer's smart grid
deployments.
B. Design and architect an end-to-end communications infrastructure that is integrated with the
power grid.
C. Integrate intelligent routing protocols into existing electrical grids.
D. Create a single infrastructure for unified communications from electrical generation plants to all
primary and secondary substations.

Answer: D

Explanation:


QUESTION 4
Which of these is a grouping of elements that are part of the Cisco Substation Automation
solution?

A. multi service communications networks
B. protection and control, auto meter reading, data analysis
C. protection and control, grid monitoring, multi service communications networks data center and
customer call centers
D. customer call centers, electrical auto recharging, home energy management

Answer: C

Explanation:


QUESTION 5
Which of these is part of mission critical substation communications (Operation Data)?

A. physical security alarm
B. workstation email
C. physical access (deny access)
D. fault detection and restoration

Answer: D

Explanation:

Monday, 8 February 2016

650-127 CGE Authorized Connected Grid Engineer Knowledge Verification

Exam Number 650-127
Duration 60 minutes (55-60 questions)
Available Languages English

This exam will test the knowledge of system engineers and field engineers regarding the features, functions, design, and planning for deployment of the Cisco Connected Grid technology solution. There will be a focus on the features and benefits of the Cisco 2010 Connected Grid Router (CGR 2010) and the Cisco 2500 Series Connected Grid Switch (CGS 2500). The solution deployment planning will include design, configuration, implementation, and integration.

Exam Topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Introduction to Cisco Connected Grid Go-to-Market and Product Positioning
How to Sell
Cisco Connected Grid Ordering and Support
Cisco 2010 Connected Grid Router (CGR) Product Overview
Cisco 2500 Connected Grid Switch (CGS) Product Overview
Cisco Connected Grid Solutions


QUESTION 1
Which of the following models supports Power over Ethernet?

A. CGS-2520-24TC
B. CGS-2520-16S-8PC
C. All CGS models
D. None of the modelsupportsPOE

Answer: C

Explanation:


QUESTION 2
Which of the following is not a supported PDI Help Desk function?

A. design and configuration support
B. technical product question
C. implementation questions and support
D. On site support
E. RFP review

Answer: D

Explanation:


QUESTION 3
Which function is available on the Cisco Series 2500 Connected Grid Switch?

A. EnergyWise
B. inputs and outputs for alarms
C. GRWIC modules
D. StackWise

Answer: C

Explanation:


QUESTION 4
Which of these describes the overall vision of the Cisco Smart Grid?

A. Create a single infrastructure for Unified Communications from electrical generation plants to all
primary and secondary substations.
B. Integrate intelligent routing protocols into existing electrical grids.
C. Sell existing Cisco IP-based products to be used from end-to-end in our utility customer smart
grid deployments.
D. Design and architect an end-to-end communications infrastructure integrated with the power.

Answer: A

Explanation:


QUESTION 5
How many power supply slots are available on each Cisco CGR 2010 chassis?

A. 1 slot
B. 4 slots
C. 2 slots
D. No slots because all power is integrated over IP.

Answer: C

Explanation:

Monday, 1 February 2016

650-059 LCSARS Lifecycle Services Advanced Routing and Switching


The 650-059 LCSARS Lifecycle Services Advanced Routing and Switching exam tests a candidate's knowledge and skills for the Cisco Lifecycle Services approach to help successfully sell, deploy, and support Cisco technologies and optimize their performance. Candidates can prepare for this exam by taking the LCSARS Lifecycle Services Advanced Routing and Switching course.

Exam Topics
The following topics are general guidelines for the content likely to be included on the exam. However, other related topics may also appear on any specific delivery of the exam. In order to better reflect the contents of the exam and for clarity purposes, the guidelines below may change at any time without notice.

Describe the value of Cisco Lifecycle Services for Advanced Routing & Switching
Identify the phases of the Cisco Lifecycle Services for Advanced Routing & Switching
Identify the value of the Cisco Lifecycle Services for Advanced Routing & Switching
Describe the value of the service components included in the Prepare phase
Describe the value of the service components included in the Plan phase
Describe the value of the service components included in the Design phase
Describe the value of the service components included in the Implement phase
Describe the value of the service components in the Operate phase
Describe the value of the Service Component in the Optimize phase

Describe the value of the activities in each phase of the Cisco Lifecycle Services approach
Describe the value of the activities included in the Prepare phase
Describe the value of the activities included in the Plan phase
Describe the value of the activities included in the Design phase
Describe the value of the activities in the Implement phase
Describe the value of the activities included in the Operate phase
Describe the value of the activities included in the Optimize phase




QUESTION 1
Which two of these activities comprise the problem management service component in the operat
phase? (choose two.)

A. send a replacement module
B. schedule a maintenance window
C. manage the problem
D. identify the problem
E. confirm roles and responsibilities

Answer: C,D


QUESTION 2
Identify a customer support model for the solution is an activity thet is part of which service
component in the plan phase?

A. operations readiness assessment
B. planning project kickoff (deployment project management)
C. operations plan development
D. system requirements validation

Answer: A


QUESTION 3
Which three of these service components are included in the optimize phase? (choose three.)

A. change management
B. security administration
C. technology assessment
D. operations assessment
E. operations readiness assessment
F. security assessment

Answer: C,D,F


QUESTION 4
Utilizing a trouble ticketing system to track problems is a part of which service component in the
operate phase?

A. operations setup
B. change management
C. problem management
D. systems monitoring

Answer: C


QUESTION 5
Execute the systems acceptance test plan is an activity that is part of which service component in
the implement phase?

A. phased implementation
B. acceptance testing
C. staff training
D. full system migration

Answer: B